New back-up Generator @ High School |

New phase loss protected Switchgear @ High School |

Water Retention Basin @ approx. 11:30 a.m. at peak of heavy rainfall |

Water Retention Basin @ 2:30 p.m. same day
|

New Power Transformer @ GS |

Cement Pad for Emergency Generator @ HS |

Delivery of New Air Conditioning Unit @ HS |

New Sod @ Softball Field |

New Sod & Pitcher's Mound @ Baseball Field |

New Handicap Accessible Path to Basebal/Soccer Fields |

National Grid preparing for power changeover @ Grimshaw |

Grimshaw Game & Practice Fields - new sod and hydroseed |

Energy Efficient Lights in GS Classrooms |

Finish Roof @ DO/Bus Garage/Maintenance Building |

New Hot Water Heating System @ GS |

Energy Efficient Lights in GS Hallways |

Installing Sod @ GS Field |

Watering Sod @ GS Field |

New Bases for Light Poles @ HS |

Finish Look of Glass Block Windows in HS Gym |

Update on Baseball Field |

Update on Softball Field |

New Dishwasher @ HS |

Water Heaters @ HS |

Roof of Concession Stand |

Another View of Concession Stand Roof |

Installing Glass Blocks in HS Gym |

Concession Stand/Bathroom - Construction Workers |

Concession Stand/Bathrooms |

Concession Stand/Bathroom - Construction Workers |

Baseball Field |

Baseball Field |

Readying Softball Field for Drainage |

Drainage Pipes for Softball Outfield |

Concession Stand Construction |

Concession Stand Plumbing |

New Natural Gas Piping & Meter for
Emergency Generator @ HS |

Trench for Electrical Conduit @ GS
|

Removal of Old Roof @ District Office
|

Preparing 2nd Floor for
Energy Efficient Lighting @ GS |

Setting up for installation of
Energy Efficient Lighting @ GS |

Bruce Bedell cleaning out lockers
|

Soccer Field @ GS |

Soccer Field @ GS |

Poured Foundation for Concession Stand |

Setting up for Glass Block Installation |

Preparing Gym Floor for Logo |

Ongoing Work @ HS |

National Grid @ High School |

Concession/Restroom Forming for Footers |

Poured Footers for Concession Stand/Restroom |

Wall Demolition for Glass Block HS Main Gym |

Drainage Pipe for Grimshaw School Athletic Field |

Drainage Trenches for Grimshaw Athletic Field |

Asbestos Decontamination Tent @ GS
|

Groundbreaking for new restroom/concession stand @
Jr./Sr. High School
|

Groundbreaking for new restroom/concession stand @
Jr./Sr. High School
|

Excavation for utilities to new restroom/concession stand
@ Jr./Sr. High School |

Excavation for utilities to new restroom/concession stand
@ Jr./Sr. High School |

Demolition and infill of Jr./Sr. High School Gym skylights |

Demolition and infill of Jr./Sr. High School Gym skylights |

Mrs. Skeval in temporary office located at High School |

Taking out boilers from Grimshaw |

Boiler debris |

Workers setting up silt fence
Silt fence prevents dirt from draining into wetlands. DEC requirement |

Silt fence going up hill near Grimshaw School |
|
Scraping soccer field @ Grimshaw
|
Drilling of well for irrigation of new field @ Grimshaw
|

1st Floor Ceiling Demolition |

1st Floor Corrider Floor Protection |

2nd Floor Ceiling Demolition |

Contractors Fenced Area @ Grimshaw |